PROJECTS

Highland Village Parking Garage

Parking garage

FBC South Post Oak Sportsplex

Crain Group improved the baseball fields with new turf, re-grading, and necessary equipment. Other site improvements included the existing parking lot was replaced with a new concrete one, the addition of the 4,422 square feet pre-engineered concession building, a 10,156 square feet six-bay building with netting systems, restrooms, two 112 square feet press boxes, and a sidewalk.

Winward Racing

The construction project included a site and civil package that provided accommodations for the Windward Racing team’s international headquarters. It involved the design and construction of a 40,000-square-foot Class A Steel Structure, along with a Pre-Engineered Metal Building Hybrid design. 

FBC Precinct 3 Annex

MMLJ – Dustless Blasting Facility

Salons by JC Market at Shenandoah

Crain Group is thrilled to be working with Salons by JC again. This is the 10th location we’ve been a part of!

FBISD Triplex Building Renovations

FBISD Madden Elementary Classroom Addition

This project is our 17,970sf addition to the Madden Elementary School in Richmond, TX! It features 10 new classrooms, 4 workspaces and a large flex learning area for the students. We hope the faculty and students are enjoying their new space!

#craingroupllc #project #FBISD #RichmondTX #GeneralContractor #Houstonconstruction #Addition #HoustonConstruction

FBISD Madden Elementary Classroom Addition
FBISD Madden Elementary Classroom Addition

Messina Hof Winery- Harvest Green

Hometown Bank of Galveston

Mustang Seal II Spec Building

Humble ISD ES Multi-Purpose Gym (Group 3)

Cleveland ISD North Side Elementary School

First United Methodist Church Pearland

FBISD Fine Arts Additions & Renovations

Building additions in the Fine Arts departments at 4 school campuses and renovations to 16 other school campuses.

Fort Bend County Emergency Operations Center

New 2 Story Emergency Operations Center with Level 1 at 13,700sf and Level 2 at 10,545sf.

Mustang Seal Solutions

Mustang Seal is a Design Build of an approximately 30,000sf Office/Manufacturing Facility that will be a Fully Conditioned Manufacturing Warehouse with a Modest Area of Offices and Restrooms.

Fort Bend County South Post Oak Park Expansion

Renovations, additions and upgrades to football fields
Fort Post Oak Park Expansion

Fort Bend County Public Safety Annex

New Public Safety Annex Office Building of approximately 16,735sf.

Lifepoint Fellowship

14,938 sq. ft. Two-Story New Construction Facility – © HDR Architecture, Inc.

UTMB Medical Library Lounge

Fort Bend County Medical Examiner’s Office

City of Galveston Fire Station #4

14,938 sq. ft. Two-Story New Construction Facility – © HDR Architecture, Inc.

Fort Bend County George Memorial Library

Highland Village Shopping Center

45,440 sq. ft. Two Story Shell Building / Lease Space

Fort Bend County Parking Garage Phase I

5 Story Parking Structure

Metro Service and Inspection Facility

48,000 sq. ft. New construction “Service and Inspection Facility” for Metro Light Rail

Highland Village Parking Garage

Parking garage

Westview Business Park

Port Neches City Hall

12,950 SQ. FT. New Construction of a two-story “City Hall” building that will also serve as an “Emergency Operations Center” during severe weather conditions. 

Longview Hospitality Health ER

Clear Lake Chinese Church

Pearland Fire Station #3

Crain Group, LLC

Fort Bend County Parking Garage Phase II

Sports Complex at Shadow Creek Ranch

Brazoria County Drainage District #4

New construction of one story office building and boardroom. The total area of this project was 7,170 square feet.

Harvest United Methodist Church Phase I

Crosspoint Church Children’s Facility

Harvest United Methodist Church Phase II

Fort Bend County Library Administration Building

Pearland Fire Station #5

Seabrook Public Works & Animal Control Complex

Pearland Fire Station #2

Hospitality Health ER – Tyler

Hospitality Health ER – Galveston

First Colony Mall Expansion

Salons by JC

Crain Group has handled the interior build out for seven (7) Salons by JC locations.

  • Baybrook
  • Holcombe
  • Missouri City
  • Pearland Parkway
  • Pearland Town Center
  • Sugar Land
  • Willowbrook

Testimonials